Successful 18-Coach Trial Run Conducted on Katra-Budgam Track of Udhampur-Srinagar-Baramulla Rail Link (USBRL) project

Vande Bharat Sleeper trains

An 18-coach trial run was conducted on the Katra-Budgam track of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, officials said on Sunday.

An official told that an 18-coach rake departed from Katra at 8 am and is heading to Budgam for the trial run.He said that top railway officials are also monitoring the trial run.

The USBRL project has been completed, and the final phase of train operations is underway, he added.

Similar Posts